Tuesday, December 16, 2008

Rehab Post #5

The house rehab is moving right along, although things have slowed down due to the unseasonably cold weather. Our contractor was hoping for more 32+ degree days that are normal for December. The below freezing temps (water freezing temps, that is) has slowed down the masonry. Here are some of the latest and greatest pics...

The house has been "cleaned" (aka acid washed). It looks amazing.
Notice how the neighbor's house is covered up!

First floor framing

The super beam!

Old stairs leading to second floor.
These will be replaced with steel stairs, wood treads

Cement mixer, putty putty
First floor addition finished (minus veneer)